In Germany a heavy-haul permit is welded to one licence plate, and nobody can apply until a carrier is appointed. We hold it instead — and we start while your tender is still open. So the day you win, the permit is already there.
Watch German heavy haulage in actionWhen an OOG movement in or out of Germany goes out to tender, three or four forwarders quote within a few percent of each other. What separates the offers is the one line nobody wants to sign: the committed delivery date.
Same cargo. Same route. Two entirely different offers.
Most forwarders have a German subcontractor. Very few have one who holds the permit independent of the truck. That difference is the entire product.
TRANS AURIGA is entered as applicant under § 29 StVO in the German VEMAGS system. The permit is issued to us — so the application can start weeks before anyone knows which truck will run.
The executing carrier is named within the procedure and can be swapped without restarting it. Same day instead of 4 to 6 weeks, where the axle configuration matches — and we verify that before you commit anything to your client.
Route surveys, bridge load calculations, conditions, escorts, sixteen federal states with sixteen sets of local practice. You receive a finished permit PDF. Nobody on your team ever writes an email to a German Landratsamt.
Real footage from a real escorted movement. No stock library, no PR shoot — an ordinary night on a German B-road.
Not hypotheticals. These are the three files that land on a project forwarder's desk and turn a won tender into a loss.
Your client sells DAP or DDP to a German end customer, and you carry the whole chain including the last 300 km from the port. The vessel berths, customs is clean, and the cargo doesn't move because nobody arranged the heavy-haul permit for the on-carriage. Storage and demurrage run daily. And your client calls you, not the German sub.
How we solve it →From that moment the entire German pre-carriage sits with you — collection at the factory gate, permit, escort, port. Without a partner in Germany who can genuinely carry that, you cannot credibly bid at all. Most forwarders have a sub. The question is whether that sub can hold a permit before a truck exists.
How we solve it →Six weeks of lead time on the permit. Forty-eight hours before loading, your German carrier finds better utilisation elsewhere and steps off the job. Today that means the date collapses and the penalty clause wakes up. With the permit held by us: different truck, same permit, same day.
How we solve it →We don't sell permits. We sell the ability to commit.
The permit is in place before your carrier is. You quote a date because the precondition already exists — not because you are hoping.
Carrier drops out or is replaced: the substitute runs under the same permit. Same day, no new application, no new fee.
We monitor your routes continuously — roadworks, downgraded bridges, changed conditions. You hear about a risk before it becomes an incident.
Dates, dimensions or routing shift: we amend the permit. Its lifespan is the lifespan of your project, not of one loading slot.
Three anonymised cases from nine years of practice — what happens when the permit already exists before the transport is fixed.
Two days before the opening in Stuttgart, the vehicle failed and the exhibit was still in northern Germany. A replacement unit was placed on the same procedure within 24 hours. The date held and the stand opened on time.
A plant builder selling FOB, with the buyer nominating the port only once the vessel was fixed. Permits ran in parallel for Rotterdam, Antwerp, Bremerhaven and Hamburg. The moment the vessel was confirmed, the transport rolled — no loop, no re-application.
The regular carrier cancelled three days before loading. A new carrier from the pool was named and exchanged inside the running procedure. The transport ran on the original date, and the client never learned there had been a problem.
TRANS AURIGA is entered in the German VEMAGS procedure as an applicant in its own right under § 29 StVO. The permit is issued to us and held by us — not to your carrier, not against a licence plate.
That single legal fact is what makes the carrier exchange possible. When a carrier drops out, the permit stays, and the next one rolls.
Before TRANS AURIGA he ran his own heavy haulage operation — Goldhofer, low bed, boiler bridge. He knows dispatch from the inside and the permit authorities from the outside, and he knows which federal state does what in practice.
At TA Permit SAFE he is Head of Oversize Trucking & Handling. When your file gets complicated, he is the one working it.
You are a forwarder. You do not need to be sold to — you need to know whether this holds up on your next German file.
In English, online. You describe what is on your desk, we tell you honestly whether our model changes anything for it. Free, and with no obligation attached.
Send us a real case — dimensions, weight, destination. We come back with lead time, feasibility and what could be committed to your client. This is where most forwarders decide.
If it fits, we set up the permit layer under your operation — for one project or as a standing arrangement across recurring lanes. Structure and commercials are agreed to your volume.
Bring one live OOG shipment to a 30-minute call and we will tell you whether the date is committable. If it is not, we will say so.